AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Calcasieu pass lng project9/18/2023 ![]() “This historic and proud moment for our company represents the culmination of many years of relentless efforts by our team to innovate, design, construct and now deliver low-cost, clean LNG to our customers. The Calcasieu Pass facility, located on over 1000 acres and 1 mile of deep-water frontage, includes two ship loading berths for LNG vessels carrying a capacity of up to 185,000 cubic meters and two 200,000 cubic meter full containment LNG storage tanks. Both of those projects are located in Plaquemines Parish.“Venture Global is honored to partner with JERA, one of the world’s largest buyers of LNG, on the inaugural commissioning cargo from Calcasieu Pass,” said Venture Global CEO Mike Sabel. In addition to Calcasieu Pass, Venture Global LNG also is developing the 20-MTPA Venture Global Plaquemines LNG facility 30 miles south of New Orleans on the Mississippi River, and the 20 MTPA Venture Global Delta LNG facility, also on the Mississippi River south of New Orleans. These are the first contracts awarded under the master equipment supply agreement between Venture Global LNG and BHGE for 60 MTPA of production capacity. Equipment deliveries are expected to begin in the second half of 2020.īHGE will also provide associated field support services to assist in the oversight, installation and commissioning of the supplied equipment. Additionally, BHGE will deliver a comprehensive power island system (PIS) that includes power generation and electrical distribution equipment for the facility. ![]() These modules will be manufactured, assembled, tested and transported from BHGE’s plants in Italy. The modularized system enables faster installation and lower construction and operational costs," BHGE said. Under its contract, BHGE said it will provide an LNG liquefaction train system (LTS) with 18 modularized compression trains across nine blocks, for a total nameplate capacity of 10 MTPA. TransCameron will have capacity to deliver 1.9 Bcfd and meet the full plant gas supply demand, Venture Global said. The facility will be interconnected via the TransCameron natural gas pipeline, a single 42-inch diameter, 24 mile long pipeline that will extend from interconnection points within the vicinity of Grand Cheniere Station in Cameron Parish. Department of Energy.Ĭalcasieu Pass is being built on a 930-acre plot with more than a mile of deepwater frontage and two ship loading berths for LNG vessels carrying a capacity of up to 185,000 cubic meters, along with two 200,000 cubic-meter, full-containment LNG storage tanks. The project also includes an electrically driven, 611-MW combined cycle gas turbine power plant with an additional 25-MW gas-fired turbine. The project has received all necessary permits, including FERC authorization and Non-FTA export authorization from the U.S. Venture Global started construction of Calcasieu Pass earlier this year in Cameron Parish, at the at the intersection of the Calcasieu Ship Channel and the Gulf of Mexico, and is targeting commercial operations in 2022. Kiewit is designing, engineering, constructing, commissioning, testing and guaranteeing the facility. The 10 million metric ton per annum (MTPA) Venture Global Calcasieu Pass facility will employ a comprehensive process solution from Baker Hughes, a GE company (BHGE) that utilizes efficient mid-scale, modular, factory-fabricated liquefaction trains. ![]()
0 Comments
Read More
Leave a Reply. |